Opal Tower Declared Defect‑Free After Eight‑Year Legal Saga
Opal Tower’s long‑awaited ribbon‑cutting ceremony this week declared the building defect‑free, bringing to a close a saga that began with a jagged fissure on level 10 on Christmas Eve 2018.
Orbit’s One‑Hole Wonder: Three Gold‑Silver‑Base Metal Lodes Found Past the Resource Boundary
Orbit Resources announced that a single drill hole at its Lewis Ponds project in New South…
The crack forced a full evacuation and costly relocations, prompting a class action that soon split into two separate legal battles lasting eight years.
During that time, extensive rectification work was carried out on the tower’s structure, while lawyers, tenants and other observers kept a close eye on the court docket, hoping for a tidy resolution.
Finally, an engineering audit confirmed the tower is now free of defects. The ceremony featured a symbolic ribbon‑cut, a brief toast, and a sigh of relief from those who have watched the drama unfold.
With the building officially declared safe, attention now turns to whether new tenants will feel confident staying, and what lessons this episode holds for future developments.
Orbit’s One‑Hole Wonder: Three Gold‑Silver‑Base Metal Lodes Found Past the Resource Boundary
Orbit Resources announced that a single drill hole at its Lewis Ponds project in New South Wales intersected three mineralised gold‑silver…